Textile Factory Wastewater Recovery System

6 Jan

Textile Factory Wastewater Recovery System

Within the scope of minimum liquid discharge, 2000 m3/day Membrane Bioreactor + Filtration + 3-stage Reverse Osmosis system was commissioned for the leading company of the textile industry. Input COD=1500 mg/L Output COD=0 mg/L * We hope that the protection of such examples will increase in the process where our water resources are running out. #MinimumLiquidDischarge #MembraneBioreactor #ReverseOsmosis #TextileIndustry #Wastewater Treatment Tex

About the Agreement With Turkiye Petrolleri Anonim Ortaklığı

3 Jan

About the Agreement With Turkiye Petrolleri Anonim Ortaklığı

Dear our costumers and visitors,   We are delighted to announce that we did sign an agreement with Turkiye Petrolleri Anonim Ortaklığı for their wastewater treatment plant design, installation and comissioning.         #watertreatment #wastewatertreatment

About the Wastewater Recover System for Plastic Recovery Company in Morocco

21 Dec

About the Wastewater Recover System for Plastic Recovery Company in Morocco

We have commissioned our wastewater treatment plant project with a capacity of 120 m3/day. The facility consists of Physical treatment, Chemical treatment, Sand filter, Biological treatment, MBR, Carbon filter and osmosis system. The recovered water with a recovery efficiency of over 75% is used for the water needs of the machines in the factory.   We would like to thank our Moroccan business partners for their interest.

Lebanon Chips Factory Turn-key Admission

12 Aug

Lebanon Chips Factory Turn-key Admission

With participation of Lebanon Minister of Industry Dr. Imad Huballah our plant has become operational.

Lidya Mining Water and Wastewater Treatment Plants, Fire Extinguish Systems

12 Aug

Lidya Mining Water and Wastewater Treatment Plants, Fire Extinguish Systems

Gold mine operated by Lidya Mining Organization wastewater and water treatment systems have been started and in operation without issues. Furthermore fire extinguishing systems required for the organization have been installed and are operational.

Anka Ceramic Factory

12 Aug

Anka Ceramic Factory

Contract has been signed with ANKA SERAMİK firm for 12000 m3/day industrial wastewater treatment plant.

We are Continuing Our Africa Projects (2022)

12 Aug

We are Continuing Our Africa Projects (2022)

We are proud to announce we have started a new project in Africa on the first quarter of 2022. It’s giving us peace to reclaim water of these lands.

Recently Finished Projects

12 Aug

Recently Finished Projects

Our Morocco Project is completed in 28 days. Project includes units of; physical treatment, chemical treatment, MBR and reverse osmosis. Reclaimed water is used in factory production processes.

Recently Finished Projects

12 Aug

Recently Finished Projects

Baransan Aluminum Wastewater Treatment Plant’s installment has been completed and the system has been started up.