Textile Factory Wastewater Recovery System

6 Jan

Textile Factory Wastewater Recovery System

Within the scope of minimum liquid discharge, 2000 m3/day Membrane Bioreactor + Filtration + 3-stage Reverse Osmosis system was commissioned for the leading company of the textile industry. Input COD=1500 mg/L Output COD=0 mg/L * We hope that the protection of such examples will increase in the process where our water resources are running out. #MinimumLiquidDischarge #MembraneBioreactor #ReverseOsmosis #TextileIndustry #Wastewater Treatment Tex

About the Agreement With Turkiye Petrolleri Anonim Ortaklığı

3 Jan

About the Agreement With Turkiye Petrolleri Anonim Ortaklığı

Dear our costumers and visitors,   We are delighted to announce that we did sign an agreement with Turkiye Petrolleri Anonim Ortaklığı for their wastewater treatment plant design, installation and comissioning.         #watertreatment #wastewatertreatment

About the Wastewater Recover System for Plastic Recovery Company in Morocco

21 Dec

About the Wastewater Recover System for Plastic Recovery Company in Morocco

We have commissioned our wastewater treatment plant project with a capacity of 120 m3/day. The facility consists of Physical treatment, Chemical treatment, Sand filter, Biological treatment, MBR, Carbon filter and osmosis system. The recovered water with a recovery efficiency of over 75% is used for the water needs of the machines in the factory.   We would like to thank our Moroccan business partners for their interest.

About the Sri Lanka Mobile Package Water Treatment Plants

21 Dec

About the Sri Lanka Mobile Package Water Treatment Plants

We did handover our latest mobile water treatment plant to Sri Lankan autorites. It is 200m3/day mobile water treatment plant with its own generetor and water cycle. The system will work continiously with its own water for chemical preparation. With the chlorine generator inside the system, the units produce its own chlorine as well.   We want to thank all the authorities that made this wonderful project happened.

Lebanon Chips Factory Turn-key Admission

12 Aug

Lebanon Chips Factory Turn-key Admission

With participation of Lebanon Minister of Industry Dr. Imad Huballah our plant has become operational.

Anka Ceramic Factory

12 Aug

Anka Ceramic Factory

Contract has been signed with ANKA SERAMİK firm for 12000 m3/day industrial wastewater treatment plant.

Özgüllü Dairy Factory

12 Aug

Özgüllü Dairy Factory

Contract has been signed with Özgüllü Süt Mamülleri LTD. ŞTİ. Firm for industrial wastewater treatment plant.

OUR NEW ADRESS

12 Aug

OUR NEW ADRESS

  Adress; Sepetlipınar Mah. Yellice Sok. No:10/1 A1-A2-A3 Blok Başiskele/Kocaeli

Get Offer